基础强夯首先要在每一个夯点上做好相关的评估和预测,在施工的过程中如果没有国家的监督部门的相关人员指导,是不可以擅自施工的。每一个夯击点的施工都要有一套相应的施工方案,在施工的过程中相关的数据要随时做好记录。因为基础强行的施工过程看似容易,实际上每一个环节都是有自身的标准的。
1. Foundation dynamic consolidation should first make relevant
assessment and prediction at each consolidation point. In the process of
construction, it is not possible to construct without the guidance of
the relevant personnel of the state supervision department. The
construction of each tamping point should have a set of corresponding
construction plan, and the relevant data should be recorded at any time
in the construction process. Because the construction process of
foundation force seems easy, in fact, every link has its own standard.
2、在强夯施工的过程中最常出现的定送水 保定骨伤骨病 铜鼎铜钟 淤泥固化设备 保定舞蹈 化粪池钢模具 保定网站建设现象就是会经常的出现积水的现象,这是一定要做好及时的排水处理,尤其是在雨季施工时还要注意到防止基地松脱的现象。
2. In the process of dynamic consolidation construction, the most common
phenomenon is water accumulation. This is a must to do a good job of
timely drainage treatment, especially in rainy season construction, we
should pay attention to the phenomenon of preventing base loosening.
3、基础强夯是一项技术性比较强的工作,只有具备专业知识的人才可以很好地完成此项工作,为此要求施工者只有持证才可以上岗操作,在施工前,相关的资料还要上交到安全检察机关,以保证后期不会有安全事故发生。
3. Foundation dynamic compaction is a highly technical work. Only those
who have professional knowledge can complete this work well. For this
reason, only those who have a certificate can work on their posts.
Before construction, relevant information should be submitted to the
safety procuratorate to ensure that no safety accidents occur in the
later period.