厂房强夯前应对场地进行地质勘测

网址:www.qianghangshigong.com.cn  2019-08-21  作者:admin    阅读:

地基强夯是厂房建设施工中比较流行的施工方法,它与其他的施工方法相比有自己独特的优点,如它的施工设备仅用一台起重机和重锤即可施工即工艺非常简单,通过厂房强夯工程后能够又掉提高地基强度,同时土地的压缩性也得到几倍的提高,终而实现方式地震区砂土液化和降低大孔土湿陷的效果。
Foundation dynamic consolidation is a popular construction method in factory building construction. Compared with other construction methods, it has its own unique advantages. For example, its construction equipment can be constructed with only one crane and a heavy hammer, that is, the technology is very simple. After the dynamic consolidation of the factory building, the foundation strength can be improved and the compressibility of the land can also be improved. At last, the effect of liquefaction of sand and reduction of collapsibility of macroporous soil in seismic area can be realized.
厂房强夯前应对场地进行地质勘测,作为制定厂房强夯方案和对比强夯基地前后的加固依据,必要时还可以进行现场实验性的强夯作用来确定厂房强夯施工的各项参数依据基础。
Geological survey should be carried out before dynamic consolidation, which can be used as the basis for making dynamic consolidation plan and comparing the reinforcement before and after dynamic consolidation base. When necessary, field experimental dynamic consolidation can also be carried out to determine the parameters of dynamic consolidation construction.