建筑工程一般施工场地的土质都不一样,如果采取强夯地基处理的技术方案,就能够灵活自如的去解决难点。强夯地基的处理有强夯法和强夯置换法,两种方法在进行施工过程中都有专门人员监测。
The soil quality of construction site is different in general. If the technical scheme of dynamic compaction foundation treatment is adopted, the difficulties can be solved flexibly and freely. The dynamic compaction method and dynamic compaction replacement method are used to treat the dynamic compaction foundation. Both methods are monitored by special personnel during the construction process.
比如强夯施工前检查夯锤的质量及落距,强夯施工中查看夯击数、夯沉量,置换深度等等,记录各项参数和施工状况,每遍夯击对夯点放线复核,夯后要查夯坑方位
For example, check the quality and drop distance of rammer before dynamic compaction construction, check the number of rammers, the amount of rammers and replacement depth during dynamic compaction construction, record various parameters and construction conditions, check the laying out of rammers point every time, check the orientation of rammers pit after tamping.