强夯施工作业前应准备什么工作

网址:www.qianghangshigong.com.cn  2019-05-09  作者:admin    阅读:

强夯工作前工作人员一定啊哟掌握和了解一些工作范围内的一些基本的信息,做到心中有数,这样才能有的放矢开展工作,准备工作有下面这些。
Before the dynamic consolidation work, the staff must grasp and understand some basic information within the scope of work, so as to have a clear idea of what to do, so as to carry out the work with a definite aim, the preparation work has the following.
第一、实现通过认真的考察分析确定合理的施工方法,然后经过专业人士对方案的经济技术分析论证确定最终的施工方案,因为强夯施工要产生很大的震动和噪音,这是临近的住户们说不愿意的所以事先一定要做好防振和隔音措施。
First, through careful investigation and analysis to determine a reasonable construction method, and then through professional economic and technical analysis and demonstration of the scheme to determine the final construction plan, because the dynamic compaction construction will produce a lot of vibration and noise, which is said to be unwilling by neighboring households, so we must do a good job of vibration and sound insulation measures beforehand.
第二、一定要对施工园区的含水量和土质性质认真的比对分析,采取相应的正确的方式措施,这是有效的确保工期和施工质量;适当的保留预留土层的厚度这位后期的强夯回填的做好预留准备。
Secondly, we must carefully compare and analyze the water content and soil properties of the construction park, and take appropriate and correct measures to ensure the construction period and construction quality; appropriate retaining the thickness of the reserved soil layer, which is the reserved preparation for the later dynamic compaction backfill.
第三、一定要注意施工的天气情况、做好防水排水工作,确保工程顺利实施。
Third, we must pay attention to the weather conditions of the construction, do a good job of waterproofing and drainage, and ensure the smooth implementation of the project.