试夯是强夯施工前的准备工作

网址:www.qianghangshigong.com.cn  2019-05-09  作者:admin    阅读:

试夯是强夯施工前的准备工作,其目的就是确定合理的施工参数及工艺,强夯施工公司根据地质报告资料,会选择不同地控制图选择有代表性的地区进行试夯,试夯数量根据建筑工程的复杂程度、建设规模以及建筑类型确定,一般是根据试夯测量的数据,得到夯击次数与夯沉量的关系曲线,进而确定全面夯击时的夯锤落距、夯击遍数、最佳夯击能等技术参数,方便项目管理员指导后期施工工作。
Test tamping is the preparatory work before dynamic tamping construction. Its purpose is to determine reasonable construction parameters and technology. According to the geological report data, dynamic tamping construction company will choose different control charts to select representative areas for trial tamping. The number of trial tamping is determined according to the complexity of construction projects, construction scale and type of buildings. Generally, tamping is obtained according to the data of test tamping measurement. The relationship curve between the number of times and the amount of tamping settlement can be used to determine the technical parameters such as the drop distance of tamping hammer, the number of times of tamping and the optimum tamping energy, so as to facilitate the project administrator to guide the later construction work.

联系电话
15833439999